Castle Cooke Corporation selected
Clarion to participate in the construction of the new 1001 Columbia
project in Riverside, California.

35°F dock with vertical
storage levelers, fire riser pods and Metl-Span panels throughout.

Glycol floor heating
system with Onyx Radiant Hose by Watts Radiant.

Panel detailing at
building facade. Clarion craftsmanship on display.

Multiple penthouse units
across the roof.

A close up view of one of
the penthouses.

One of the freezer cross
aisles.

The building features high
speed, insulated Rytec doors at the entrance of the cold rooms from the
dock.

1001 Columbia project
southwest office pod.

The 1001 Columbia project
includes over 450,000 s.f. of refrigerated and frozen space with
State-of-the-Art thermal systems.
Clarion is proud to have been the thermal insulation contractor on this
project. |