Thermal Subcontractor

Freezer

El Monte, CA

Clarion was pleased to work with CEG Construction on this 22,000 sq. ft. ground up freezer in El Monte, California. With an overall 66 foot high building and a small lot line, this made for a tricky install for Clarion. Working with long reach cranes and 120 foot boom lifts, Clarion was able to complete this panel installation safely and efficiently. This was an exciting job, thank you CEG for a great project.

Project Features:

  • 62 foot Inside clear
  • All Weather urethane panels
  • Jamison man doors
  • Rytec High Speed Turboseals
  • DOW HI 60 floor insulation 
  • Custom Glycol underfloor heat system