In the middle of a pandemic, our customer needed an extensive project to come to life quickly. With approx. 7,000 sq. ft. of cold dock, cooler, and freezer, Clarion was challenged with a highly temperature sensitive product and small cube space. Clarion worked with Century Equipment to provide 100% redundant systems utilizing the most advanced KE2 Environmental controller to interface with the Johnson controlled building management system. With all cold rooms being plus or minus 2 degrees, The Metl-span insulated boxes were built with tight tolerances. Jamison Man doors were selected for the perfect seal. The HCR/Rytec combo made a perfect fit at the freezer to eliminate frost and  minimize temperature fluctuation. All the refrigeration equipment, doors, and Freon leak detection were monitored by the BMS system, for maximum reassurance for the customer. Clarion is glad to report another beautiful workhorse was created for a great customer, and we appreciate all the efforts that were involved in completing this project within the schedule required.

Project Features:

  • 1,200 sq. ft. Freezer, 4,300 sq. ft. Cooler, 1,200 sq. ft. Cold Dock
  • Metl-span urethane core (IMP Panels)
  • Dow Freezermate underfloor insulation
  • Jamison man doors 
  • Rytec High Speed doors with horn/strobe safety feature
  • Jamison HCR single stage air door
  • Century Freon Package units with 100% Redundancy
  • KE2 Centinal control system with BMS integration
  • CTI Freon Leak detection system
  • 8 sets of Anthony heated pick doors