

|
|
Clarion Construction is proud to partner with Classic
Distributing in the construction of their new distribution center in
Industry, California; this facility consolidates both of Classic's
current centers into one central location.
|
|
| |

|
|
| |
The
new logo is proudly displayed over the entrance.
|
|
| |

|
|
| |
The
cooler is 16,000 sq. ft. with 23 Clear Height and 49 Tons of Freon based
refrigeration to keep the room a consistent 38F-40F.
|
|
| |

|
|
| |
The
facility includes Rytec PD5500 Rapid Rolling Cooler doors for efficiency.
|
|
| |

|
|
| |
Kegs
awaiting delivery.
|
|
| |
The facility has 5 thick Polystyrene core panels with white steel finishes and matching
trim and 8 x 12 concrete curbs at both the interior and exterior of the
cooler.
|
|