Clarion Construction, Inc.

Planning Engineering Construction


Stater Bros Distribution Center

Red Line

 


Clarion Construction is proud to have worked as a subcontractor to Oltman's Construction Company, the general contractor on this prestigious project.

 

 
Stater Bros. Distribution Center - West Dock
 

The entire building features a Fricks specialty floor.  Here the West Dock offers an abundance of work area.

 

 
 

Stater Bros. Distribution Center - Dock Doors 

 
 

The south portion of the West Dock has a catwalk to keep pedestrians away from the fork lift traffic.  This area also features "Knock Out" doors at each of the loading positions.  Another nice feature is the pallet storage directly under the catwalk at each loading position.

 

 
 

Stater Bros. Distribution Center - Racking 

 
 

Frazier racks are standard throughout the over 700,000 sq. ft. of cold areas.

 

 
 

Stater Bros. Distribution Center - HCR Doors 

 
 

HCR double and triple air doors are fitted to the various freezer rooms.

 

 
  Stater Bros. Distribution Center - High Curbs
 
 

All High traffic areas have 4' or 6' reinforced concrete curbs.  The facility has sanitary finishes throughout.

 

 
  Stater Bros. Distribution Center - Engine Room
 
 

A "State of the Art" ammonia refrigeration system provides the cold for all of the freezers, coolers and dock areas.

 

 
  Stater Bros. Distribution Center - Ammonia Vessels
 
 

Cleanly situated and insulated vessels store the ammonia for the refrigeration compressors.


 
  Stater Bros. Distribution Center - Penthouses
 
 

24 Penthouses enclose the multitude of coils required for the refrigeration system.  TPO roofing over Dow insulation covers the entire facility.


 
 

Building Quality into the Cold Storage Industry


Home

Search

 

International Association of Cold Storage Contractors

Send mail to WebMaster with questions or comments about this web site.

International Association of

Copyright 1999-2010 Clarion Construction, Inc.
Last modified: June 17, 2010