Thermal Subcontractor

Processing Facility

Vernon, CA

Clarion performed the cold storage package for CEG Construction to bring to life a state of the art multiple tenant facility. 20,300 sq. ft. of insulated panel rooms from 10 foot to 32 foot high, that feature a 6 position cold dock, freezer rooms, cooler rooms, and food processing rooms. Using polystyrene insulated panels, we were able to get within the client budget and provide a quality install. Incorporating Jamison insulated sliding doors ensured a quality seal and beautiful fit and finish, featuring Custom Cooler man doors with stainless steel jams. With multiple ceiling heights, this job posed a nice challenge for Clarion, but resulted in a beautiful facility with a very satisfied customer.

Project Features:

  • 20,300 sq. ft. of freezer, cooler, and cold dock
  • DPS Styrene core (IMP Panels)
  • Jamison sliding doors
  • Custom Cooler man doors
  • Atlas 25 PSI underfloor insulation

About the Owner: Brad Owen is the President of Clarion Construction, a Southern California general contractor specializing in cold storage construction, food processing facilities, clean rooms, and insulated metal panel (IMP) systems. With decades of experience in temperature-controlled construction, Brad shares practical insights to help facility owners, developers, and contractors make informed decisions about specialized commercial and industrial building projects.